# New construction in Florida: condominiums and custom builds

> Buying a home that does not yet exist asks for a different kind of judgment. You are evaluating drawings, a contract, a schedule and the people who will deliver them, and in Florida the rules for condominiums have changed in ways every buyer should understand.

Source: https://www.think.luxury/journal/florida-luxury-new-construction/  
Publisher: Think Luxury (https://www.think.luxury)  
Updated: 2026-11-20

## Why do so many Florida luxury buyers choose new construction?

Some of the reasons are obvious: the chance to shape a home to your own taste, modern systems, and the simple pleasure of being the first to live somewhere. In Florida, there are practical reasons as well. Newer buildings are designed to current wind standards, typically with impact-rated glazing and engineered roof connections. New homes in flood zones are generally built to current elevation requirements, which can sit well above older houses on the same street. Both factors bear directly on insurance and resilience.

There is also the matter of supply. In established waterfront and beachfront neighborhoods, older homes are frequently replaced rather than renovated, and new condominium towers continue to rise along the coasts. Buyers looking for a modern home in a mature location often find that new construction, or a recently completed residence, is the realistic path.

Broadly, the choice falls into two categories: a pre-construction condominium, purchased from a developer before or during construction, and a custom or semi-custom house, built on a lot you own or one controlled by a builder. Each has its own contract structure, timeline and risks. Our overview of [new construction residences](https://www.think.luxury/residences/new-construction/) covers the property types in more detail.

## How do pre-construction condo deposits work in Florida?

Pre-construction condominiums are usually sold with a schedule of deposits paid at contract signing and at later milestones, such as groundbreaking or topping off. Florida law requires a developer to hold buyer deposits on new condominium units in escrow with a qualified escrow agent, and it sets specific rules about when, and to what extent, deposit funds above a certain level may be released for construction costs. The purchase contract must disclose how this works.

Read the deposit provisions carefully, and have your attorney explain them. Key questions include which portion of your deposit stays in escrow until closing, which portion, if any, may be used during construction, and under what conditions it would be returned if the project is delayed or does not proceed. The answers vary by contract.

Florida also gives buyers of new condominium units from a developer a statutory period in which to cancel the contract after signing and receiving the required disclosure documents. Use that window to read the condominium documents in full, not only the sales materials.

Consider, too, how you will fund the deposit schedule and the closing. Pre-construction purchases commit capital years before you take possession, and the mortgage market at completion may look very different from the one at signing. Some buyers plan to close in cash and finance later; others arrange financing near completion. Discuss the options with your lender and adviser well before the final payment is due.

## Why should a developer contract be reviewed by your own counsel?

Developer contracts are written by the developer's attorneys, and they are written to protect the developer. That is not sinister; it is simply how these documents work. They often give the developer considerable flexibility over completion dates, finishes, unit dimensions and the design of common areas, while limiting the buyer's remedies. A buyer who signs without independent review may not appreciate what they have agreed to.

An experienced Florida real estate attorney can explain the completion deadlines and what happens if they pass, the developer's ability to substitute materials or change plans, the buyer's rights to assign the contract before closing, how the final closing date is set, and what the condominium documents say about budgets, reserves, use restrictions and rental rules.

Pay particular attention to the estimated operating budget and the reserve schedule. In a new building, initial assessments are an estimate prepared before the association has any operating history. Asking how they were derived, and how they compare with similar completed buildings nearby, is a sensible part of due diligence.

## What timeline should you expect from contract to keys?

Pre-construction condominiums typically take several years from first sales to completion. The sequence usually runs through presales, construction financing, groundbreaking, vertical construction, interior build-out, final inspections and the certificate of occupancy, then closings. Each step depends on the one before, and delays at any stage, from permitting to supply chains to weather, push the rest back.

Custom homes run on a different clock. Design, engineering and permitting can take many months before ground is broken, particularly on waterfront and beachfront lots where additional approvals apply. Construction itself depends on the size and complexity of the house and the builder's capacity. Florida's hurricane season, which runs from June through November, can affect schedules on any project.

The practical advice is to plan around a range rather than a date. If you are selling another home, renting in the meantime or timing a relocation for a school year, build in a margin and discuss contingency plans with your agent and attorney.

## What changed for Florida condominiums after Surfside?

Following the collapse of Champlain Towers South in Surfside in 2021, Florida enacted significant reforms to condominium safety. In general terms, the legislation introduced milestone inspections, which require structural inspections of qualifying condominium buildings at set points in their life and periodically thereafter, and structural integrity reserve studies, which require associations to evaluate key structural components and fund reserves for their eventual repair or replacement.

The reforms also restricted the ability of associations to waive or reduce reserve funding for those structural components, a practice that had been common in some buildings. Subsequent legislative sessions have refined the rules, and implementation continues to evolve, so the details are best confirmed with an attorney or the association at the time of purchase.

For buyers of new construction, these changes are largely reassuring. A new building begins its life under the current framework, with reserve studies and inspection schedules built into its planning. It is still worth asking the developer how the initial budget accounts for structural reserves, and reviewing the turnover provisions that govern when owners take control of the association. Buyers of [penthouses](https://www.think.luxury/residences/penthouses/) and other tower residences in places like [Miami Beach](https://www.think.luxury/markets/miami-beach/) will find these questions especially relevant.

## Custom new builds: lot, architect and builder

A custom home begins with the lot, and in Florida the lot carries more constraints than many buyers expect. Flood zone and required elevation, setbacks, height limits, community architectural review, and on the beach the Coastal Construction Control Line all shape what can be built. A surveyor and a local architect can tell you what a lot will actually allow before you commit to it. Our guide to [waterfront due diligence](https://www.think.luxury/journal/florida-waterfront-due-diligence/) covers seawalls, docks and flood considerations that apply equally to a lot purchase.

Select the architect and builder with care, and ideally early enough that they can collaborate. Contracts are commonly structured as fixed price, where the builder commits to a sum for a defined scope, or cost-plus, where the owner pays actual costs plus a fee. Each has trade-offs in transparency, flexibility and risk, and the right choice depends on how fully the design is resolved before construction starts.

Florida's construction lien law is worth understanding. Subcontractors and suppliers who are not paid can, in certain circumstances, place a lien on the property even if the owner has paid the general contractor. Requiring lien releases with each draw, and following the process around the recorded notice of commencement, helps protect the owner.

## Finish selections, allowances and change orders

Most new homes and many new condominiums involve a selections process for flooring, cabinetry, stone, plumbing fixtures, lighting and appliances. In a custom build, these are often covered by allowances: budgeted amounts for categories of finish that will be chosen later. Allowances that are set too low are one of the most common sources of budget overruns, so review them against the finishes you actually expect to choose.

Change orders are the other. Every change after a contract is signed, however small, should be documented in writing with its cost and its effect on the schedule. Small changes accumulate, and the time cost can matter as much as the money. Making decisions early, and resisting the temptation to revisit them, is the most effective way to keep a project on course.

For condominium buyers, ask exactly what is included in the base finish package, what upgrades are offered, and whether you may bring in your own designer after closing. Some buyers choose a unit delivered with minimal finishes precisely so they can complete it to their own specification.

Visit the model residence or showroom with a critical eye. Models are often finished with upgrades, custom millwork and furniture that are not part of the standard offering, and the difference can be substantial. Ask for the written specification for the unit you are buying and compare it line by line with what you saw, so the residence you receive matches the one you expected.

## How do you judge a builder's or developer's reputation?

Look at completed work, not renderings. Visit buildings and homes the developer or builder has delivered, ideally ones that have been occupied for a few years, and speak with owners where possible. Ask how warranty items were handled, whether the project was delivered close to schedule, and how the developer behaved when something went wrong.

Check licensing with the state, review public records for litigation and liens, and ask about the financing behind a condominium project. For custom builders, ask for references from the architects they have worked with as well as from clients, and confirm insurance coverage before work begins.

New construction can be a rewarding way to own in Florida, particularly in growing communities such as [Lakewood Ranch](https://www.think.luxury/markets/lakewood-ranch/) where newer homes are the norm. The buyers who enjoy it most are those who treat the contract, the schedule and the team as seriously as the floor plan. Further questions about how new developments appear on the marketplace are answered in our [FAQ](https://www.think.luxury/faq/).

## Questions and answers

### Are pre-construction condo deposits protected in Florida?

Florida law requires developers to hold buyer deposits on new condominium units in escrow, with specific rules about when portions above a certain level may be used for construction. The purchase contract must disclose these terms, and buyers should have an attorney explain them before signing.

### What are milestone inspections in Florida?

Milestone inspections are structural inspections that qualifying condominium buildings must undergo at set points in their life and periodically afterward. They were introduced as part of the condominium safety reforms Florida enacted after the Surfside collapse.

### What is a structural integrity reserve study?

It is a study that evaluates a condominium building's key structural components and estimates the reserves needed to repair or replace them over time. Florida now requires qualifying associations to complete these studies and restricts waiving reserve funding for those components.

### Should I use my own attorney when buying new construction?

Yes. Developer and builder contracts are drafted to protect the seller, and an independent Florida real estate attorney can explain deposit terms, completion deadlines, substitution rights and the condominium documents before you commit.
